Commit Graph
2 Commits
Author SHA1 Message Date
Brandon LiandClaude Opus 5.5 acb8879575 Reporter: name the accounts whose final day completed their cycle
cycleCompletion() says whether today's P&L finished the current cycle
(profit target, consistency and minimum days all met) — projectPerfectPath's
completion probe run without and with today. The reporter counts those as
`completed` (a subset of targetHit) and sends their names, so the master
can keep an account a firm erases after it passes. Checked ahead of the
lockout branch: a firm locking a passed account is no DLL loss. The local
dashboard shows them with a purple Completed pill.

Because the master keeps a completion for good, doubtful reads stay
'none': weekends, a Monday with a weekend-dated row, the first minutes
after the 5 PM roll, and history that hasn't freshly loaded.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-23 12:28:41 -05:00
Brandon LiandClaude Fable 5 50a5eb4713 Add TopstepX platform support, drain withdrawal stages, and perfect-path calendar projection
- TopstepXClient (ProjectX Gateway): API-key auth, SignalR user hub,
  Trade/search daily P&L, emulated OCO exits, books-invariant
  withdrawal detection for $0-start accounts
- Platform-aware client pool, credentials (api_key column), and
  credential form; $0-size account types match by prefix alone
- Drain stages: min-day ($5-$15 randomized) MNQ legs for the
  configured days, then wait for the 50% withdrawal; stage pills
  show 'Stage N – Drain'
- Account calendar projects the perfect path: future days book their
  planned targets, simulated 50% withdrawals, payout marker

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-09-12 16:25:52 -05:00